[1]
2014. Scheduling of Leaching Requirements to Prevent the Secondary Salinisation in the Root Zone. Journal of Engineering. 20, 08 (Aug. 2014), 35–51. DOI:https://doi.org/10.31026/j.eng.2014.08.03.