[1]
2016. Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP. Journal of Engineering. 22, 8 (Aug. 2016), 1–13. DOI:https://doi.org/10.31026/j.eng.2016.08.13.