[1]
2014. Comparative Study for Risk Criteria of Al-Qudus Plant between the Present and Planning of MOE. Journal of Engineering. 20, 09 (Sep. 2014), 30–42. DOI:https://doi.org/10.31026/j.eng.2014.09.03.