[1]
2009. STUDYING OF HEATED WATER RELEASED FROM SOUTH-BAGHDAD ELECTRIC POWER STATION TO THE TIGRIS RIVER. Journal of Engineering. 15, 04 (Dec. 2009), 4193–4203. DOI:https://doi.org/10.31026/j.eng.2009.04.07.