[1]
2015. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area. Journal of Engineering. 21, 02 (Feb. 2015), 37–47. DOI:https://doi.org/10.31026/j.eng.2015.02.03.