[1]
2021. Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate. Journal of Engineering. 27, 2 (Feb. 2021), 106–125. DOI:https://doi.org/10.31026/j.eng.2021.02.08.