[1]
2014. Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model. Journal of Engineering. 20, 09 (Sep. 2014), 10–29. DOI:https://doi.org/10.31026/j.eng.2014.09.02.