[1]
2003. GENERATION RESCHEDULING FOR ALLEVIATING OVER LOADS CAUSED BY CONTINGENC. Journal of Engineering. 9, 02 (Jun. 2003), 207–223. DOI:https://doi.org/10.31026/j.eng.2003.02.05.