(1)
STUDYING OF HEATED WATER RELEASED FROM SOUTH-BAGHDAD ELECTRIC POWER STATION TO THE TIGRIS RIVER. jcoeng 2009, 15 (04), 4193-4203. https://doi.org/10.31026/j.eng.2009.04.07.