Improving Voltage Stability in Kurdistan Power System in Areas with Deficit Power Production by Rescheduling the Active Power Based on PSS/E Simulation. (2023). Journal of Engineering, 29(11), 64-94. https://doi.org/10.31026/j.eng.2023.11.05