Scheduling of Leaching Requirements to Prevent the Secondary Salinisation in the Root Zone. Journal of Engineering, [S. l.], v. 20, n. 08, p. 35–51, 2014. DOI: 10.31026/j.eng.2014.08.03. Disponível em: https://joe.uobaghdad.edu.iq/index.php/main/article/view/2543. Acesso em: 24 dec. 2024.