“DESIGN AND IMPLEMENTATION OF COMPUTER AIDED SYSTEM FOR QUALITY IMPROVEMENT INSPECTION AND TESTING FOR BOILER IN THERMAL ELECTRIC POWER STATION”. 2007.
Journal of Engineering
13 (02): 1354-67.
https://doi.org/10.31026/j.eng.2007.02.03
.