“DESIGN AND IMPLEMENTATION OF COMPUTER AIDED SYSTEM FOR QUALITY IMPROVEMENT INSPECTION AND TESTING FOR BOILER IN THERMAL ELECTRIC POWER STATION” (2007) Journal of Engineering, 13(02), pp. 1354–1367. doi:10.31026/j.eng.2007.02.03.