[1]
“Hydraulic Analysis of the Cisangkuy River Weir Development Plan to Increase Flow at the PDAM (Regional Water Company) Inlet”, jcoeng, vol. 32, no. 6, pp. 1–21, Jun. 2026, doi: 10.31026/j.eng.2026.06.01.