[1]
“Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects”, jcoeng, vol. 28, no. 7, pp. 31–42, Jul. 2022, doi: 10.31026/j.eng.2022.07.03.