[1]
“A Control Program for Hydropower Operation Based on Minimizing the Principal Stress Values on the Dam Body: Mosul Dam Case Study”, jcoeng, vol. 29, no. 06, pp. 30–45, Jun. 2023, doi: 10.31026/j.eng.2023.06.03.