[1]
“GENERATION RESCHEDULING FOR ALLEVIATING OVER LOADS CAUSED BY CONTINGENC”, jcoeng, vol. 9, no. 02, pp. 207–223, Jun. 2003, doi: 10.31026/j.eng.2003.02.05.