“Hydraulic Analysis of the Cisangkuy River Weir Development Plan to Increase Flow at the PDAM (Regional Water Company) Inlet”. Journal of Engineering, vol. 32, no. 6, June 2026, pp. 1-21, https://doi.org/10.31026/j.eng.2026.06.01.