“Scheduling of Leaching Requirements to Prevent the Secondary Salinisation in the Root Zone”. Journal of Engineering 20, no. 08 (August 1, 2014): 35–51. Accessed May 21, 2024. https://joe.uobaghdad.edu.iq/index.php/main/article/view/2543.