المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن

Main Article Content

Sawsan Rasheed Mohammad
Alaa Mohsin Mahdi

Abstract

Talking about the construction industry, they frequently characterized by risk, where most of the construction projects involved in the property being fraught with risks and uncertainty, and this is due to the complexity of the industry and the length of the project, and the large number of parties that have a relationship with them. The risks in the projects is a reality that can not be neglected or ignored or canceled, but must be managed properly and so transferred, distributed or transferred, and in any case be required to avoid the impact (if possible) or reduce the losses caused them to a minimum.
It is noted that the bulk of the claims between the contracting parties arising from those risks where those claims either extension or compensation or extension and compensation together, causing an increase in the cost and duration of the project construction and thus exposed the project manager and architect of the cost problem of building the project within budget and the prescribed period. Recognizes Parties on those claims to be settled through follow-up and resolution takes time and effort "significant" and which may extend for many years after the end of the contract, as well as no one can predict the final outcome of this settlement, although it was in many cases in additional losses to the party who made those Claims believing they زٍؼٛػ for some of the losses incurred by the former, and therefore called for the need to conduct a study of the risks that lead to get these claims and to analyze them in order to identify risks causing compensation claims, as well as causing claims extension and its impact on construction projects and how departments and actions that can be taken to avoid or minimize those risk (in addition to the use of methods and modern techniques to predict the impact of those risks on the cost of the project, which help control and minimize the impact of those claims in construction projects). Results showed that risks causing compensation claims, as well as causing claims ot the most prominent "were errors in guessing, paras created in addition to changes in designs, has also been reached on a number of actions that would lead to avoid or reduce these risks to as little as possible.

Article Details

How to Cite
“المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن” (2014) Journal of Engineering, 20(10), pp. 1–18. doi:10.31026/j.eng.2014.10.10.
Section
Articles

How to Cite

“المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن” (2014) Journal of Engineering, 20(10), pp. 1–18. doi:10.31026/j.eng.2014.10.10.

Publication Dates

References

 Abdissa Dessa "Claims in Ethiopian Construction Industry". a Thesis Presented to School of Graduate Studies Addis Ababa University of Technology in Partial Fulfillment of The Requirement of The Degree of Master of Science in Civil Engineering , 2003 .

 Albert Lester "Project Management , Planning & control". Elsevier Science and Technology Book , Fifth Edition ,2006 .

 David Chappell , Vincent Powell,Smith , John Sims "Building Contract Claims". Library of Congress , Fourth Edition , 2005.

 David M.Kleman , Kleman , Lawernce , Baskind "Construction Claims and Damages , 2002 .

 Dennis Lock "Project Management in Construction" Printed in Great Britain by MPG Books Ltd , Bodmin , Cornwall , 2004.

 Duncan Cartlidge Frics "Quantity Surveyor’s Project Book". First Edition , Elsevier’s Science and Technology , Department in Oxford , UK , 2009.

 EL-Eazabi , Hornby , Parnwell "English-Arabic Reader,S Dictionary , Oxford". 1980

 Eric Verzuh "The Fast Forward MBA in Project Management". John Wiley & Sons , Inc. ,Hoboken , Newjersey , Second Edition , 2005 .

 Gustafson David A. "Theory and Problems of Software Engineering" McGraw- Hill Companies , Inc-, Manufactured in The United States of America , 2002 .

 James P. Lewis "Project Planning , Scheduling , and Control a Hands-On Guide to Bringing Projects in On Time and On Budget". Third Edition , McGraw-Hill Companies ,Inc- U.S.E , 2001.

 Jason Westland "The Project Managemant Life Cycle". London , United Kingdom , 2006 .

 Jingbo Jiang , Yilin Yin "The study of contractor’s time claim and cost claim" . Journal of IEEE , 2009.

 Kendrick Tom "Identifying and Managing Project Risk : Essential Tools for Failure-Proofing Your Project". AMACOM , U.S.A , 2003 .

 Krige Visser, Pierre Joubert "Risk Assessment Modeling for the South African Construction Industry" . PICMET , Cape Town , South Africa , 2008

 Michael Springer "IT (Information Technology) Project Management".. Course Technology , United States of America , Third Edition , 2004 .

 Michael W. Newell , Marin N. Grashna "The Project Management Question and Answer Book". American Management Association , 2004.

 Office of Project Management Process Improvement "Project Risk Management Handbook". First Edition , 2003 .

 Paul C. Dinsmore , Jeannette Cabanis – Brewin "The AMA Handbook of Project Management". Second Edition , United States of America , 2006 .

 Roger Flanagan , George Norman "Risk Management and Construction". Blackwell Science ITD , Oxford , 1993

Most read articles by the same author(s)