Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method

Main Article Content

Mustafa Hassan Talib
Sedqi Ismael Rezouqi

Abstract

This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost

Article Details

How to Cite
“Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method” (2023) Journal of Engineering, 29(06), pp. 72–86. doi:10.31026/j.eng.2023.06.06.
Section
Articles

How to Cite

“Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method” (2023) Journal of Engineering, 29(06), pp. 72–86. doi:10.31026/j.eng.2023.06.06.

Publication Dates

References

Al Maamari, A., and Khan, F., 2021. Evaluating the causes and impact of change orders on construction projects performance in Oman. International Journal of Research in Entrepreneurship & Business Studies, 2(1), pp. 41-50.

Al-Ageeli, H.K., and Alzobaae, A.S.J., 2016. Critical success factors in construction projects (govermental projects as a case study). Journal of Engineering, 22(3), pp. 129-147. doi:10.31026/j.eng.2016.03.09.

Khaled, Z.S.M., Frayyeh, Q.J., and Aswed, G.K., 2015. Forecasting the final cost of Iraqi public school projects using regression analysis. Engineering and Technology Journal, 33(2), Part (A), pp. 477-486.

Baker, S., 2011. Forecasting of factos affecting brick work product. M.Sc thesis, Department of Civil engineering, University of Baghdad, Iraq. pp. 62-66.

Al-Somaydaii, J.A., 2022. Using logistic and multilinear regression technique for modeling productivity finish work construction in Ramadi city. Iraqi Journal of Civil Engineering, 16(1), pp. 64-70. doi:10.37650/ijce.2022.172886

Hassan, J., 2019. Public–private partnership as an alternative to financing suspended infrastructure projects in Iraq (Ministry of Construction and Housing and Public Municipalities as Case Study). Ph.D. thesis. University of Baghdad, Iraq. pp. 66-78.

Yockey, R.D., 2018. SPSS Demystified: A simple guide and reference (3rd ed.). Routledge. doi:10.4324/9781315268545.

Landau, S., and Everitt, B.S., 2003. A handbook of statistical analyses using SPSS. Chapman and Hall/CRC.

Kim, S., 2013. Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation. Journal of Civil Engineering and Management, 19(1), pp.86-96. doi:10.3846/13923730.2012.737829

Ranasinghe, M., 2000. Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management & Economics, 18(4), pp. 395-406. doi:10.1080/01446190050024815

Enshassi, A., Mohamed, S., and Abushaban, S., 2009. Factors affecting the performance of construction projects in the Gaza strip. Journal of Civil engineering and Management, 15(3), pp.269-280. doi:10.3846/1392-3730.2009.15.269-280

Makichi, N.C., and Adadzewa Otu, K., 2021. Resilience capabilities of managers in crisis management: The study of Swedish Sit-in Restaurants. Master’s thesis, Department of Management and Engineering (IEI), Linköping University

Gunduz, M., and Mohammad, K.O., 2020. Assessment of change order impact factors on construction project performance using analytic hierarchy process (AHP). Technological and Economic Development of Economy, 26(1), pp. 71-85. doi:10.3846/tede.2019.11262

Naji, H.I., and Zehawi, R.N., 2021. Identifying the key causes and impacts of variation orders in Iraqi construction Projects. Diyala Journal of Engineering Sciences, 14(2), pp.18-27. doi:10.24237/djes.2021.14202

Mishra, A.K., Korala, N., Khadka, S., Dhungana, A., Pokharel, R., Lama, S., Adhikari, N., Acharya, S., and Aithal, P.S., 2021. Perception based study of variation order in building construction projects. doi:10.5281/zenodo.5152781

Tuloli, M.Y., Utiarahman, A. and Palilati, M.P., 2021, March. Analysis of causes and impact of variation order in the education building project in Gorontalo Province. IOP Conference Series: Materials Science and Engineering, 1098(2), P. 022065, IOP Publishing. doi:10.1088/1757-899X/1098/2/022065

Similar Articles

You may also start an advanced similarity search for this article.