Global Post-Evaluation for Highway Construction Projects

Main Article Content

Ali M. Hashim
Hatem Khaleefah Breesam

Abstract

The Post-project evaluation in highway construction is crucial but underdeveloped in infrastructure management, especially for Iraqi road project authorities. This comprehensive study combines insights from global schemes in England, Scotland, France, Australia, Norway, and New Zealand to develop a strong post-evaluation framework. This study used criteria from six international schemes, a thematic analysis framework, and open interviews with experts to identify and improve the final list of criteria that could be used in the evaluation process. Five criteria were identified as the final result, which are efficiency (cost, time, and quality), traffic analysis (volume, travel time, and impact), safety (accidents and security), sustainability, and impact (economic and social). Then, to develop a multiple regression model for the success of a project, criterion weights were derived through the utilization of the Inner Product Vector (IPV). This study emphasizes the need for a comprehensive post-evaluation framework, especially in complex highway construction. A milestone is reached when international standards and careful variable extraction are combined. Based on empirical data and expert judgment, the mathematical model simplifies assessment and predicts project success, giving stakeholders a systematic, impartial, and comprehensive evaluation tool.

Article Details

How to Cite
“Global Post-Evaluation for Highway Construction Projects” (2024) Journal of Engineering, 30(8), pp. 169–183. doi:10.31026/j.eng.2024.08.11.
Section
Articles

How to Cite

“Global Post-Evaluation for Highway Construction Projects” (2024) Journal of Engineering, 30(8), pp. 169–183. doi:10.31026/j.eng.2024.08.11.

Publication Dates

Received

2023-11-22

Revised

2024-01-06

Accepted

2024-01-08

Published Online First

2024-08-01

References

Adheem Noaman, A.A. 2022. Identification of accidents causes/types associated with using highway construction equipment and materials in highways projects in Iraq. Msc. thesis, University of Baghdad.

Afrawee, A.R.M., Aodah, H.H. and Mohammed, H.A. 2020. Development of the Iraqi highways management system - case study: Basrah – Nasiriyah’s highway. Proceedings of The 2020 2nd International Conference on Sustainable Manufacturing, Materials and Technologies. https://doi.org/10.1063/5.0030802

Akoglu, H. 2018. User's guide to correlation coefficients. Turkish Journal of Emergency Medicine, 18(3), pp. 91-93. https://doi.org/10.1016/j.tjem.2018.08.001

Alfahham, A.F.H. and Alajeeli, H.K.B. 2020. Building a predictive model to improve the quality of government building construction projects in Iraq using multi linear regression technique. IOP Conference Series: Materials Science and Engineering, 888(1), P. 012060. https://doi.org/10.1088/1757-899X/888/1/012060

Al-Samarraie, H. and Hurmuzan, S. 2018. A review of brainstorming techniques in higher education. Thinking Skills and Creativity 27, pp. 78–91. https://doi.org/10.1016/j.tsc.2017.12.002

Altuğ, S.N. 2002. Risk management and post project evaluation processes for research and development projects. MS.C. Thesis, Sabancı University,

Alzahrani, J.I. and Emsley, M.W. 2013. The impact of contractors’ attributes on construction project success: a post construction evaluation. International Journal of Project Management, 31(2), pp. 313-322. https://doi.org/10.1016/j.ijproman.2012.06.006

Anbari, F.T., Carayannis, E.G. and Voetsch, R.J. 2008. Post-project reviews as a key project management competence. Technovation, 28(10), pp. 633-643. https://doi.org/10.1016/j.technovation.2007.12.001

Atkinson, R. 1999. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), pp. 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6

Azeez, M.N. and Alsaffar, A. 2023. Construction time-cost optimization modeling using ant colony optimization. Journal of Engineering, 20(1), pp. 114-131. https://doi.org/10.31026/j.eng.2014.01.09.

Braun, V. and Clarke, V. 2006. Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), pp. 77-101. https://doi.org/10.1191/1478088706qp063oa.

Burhan, A.M. 2022. An optimization model to estimate the construction costs of highways projects: Al-Rihab highway as a case study. In M. O. Karkush and D. Choudhury eds. Geotechnical Engineering and Sustainable Construction. Singapore, Springer Singapore. pp. 739-748. https://doi.org/ 10.1007/978-981-16-6277-5_59.

Chan, A.P.C., Scott, D. and Lam, E.W.M. 2002. Framework of success criteria for design/build projects. Journal of Management in Engineering, 18(3), pp. 120-128. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120).

Chang, A.S. and Ibbs, C.W. 1998. Development of consultant performance measures for design projects. Project Management Journal, 29(2), pp. 39-54. https://doi.org/10.1177/875697289802900207.

Donaldson, D. 2018. Railroads of the Raj: Estimating the impact of transportation infrastructure. American Economic Review, 108(4-5), pp. 899-934. https://doi.org/10.1257/aer.20101199.

Dotars, 2007. Ex-post economic evaluation of national highway projects: case study 1: Wallaville Bridge. Canberra: Bureau of Transport and Regional Economics.

Enshassi, A.A., Arain, F. and El-Rayyes, Y. 2014. Post-evaluation system in construction projects in Gaza strip-Palestine. Journal of Construction in Developing Countries ,19(2), P. 51.

Fang, D. and Wu, H. 2013. Development of a safety culture interaction (sci) model for construction projects. Safety Science, 57, pp. 138-149. https://doi.org/10.1016/j.ssci.2013.02.003

Guangshu, X. and Ershi, Q., 2009, October. Study on the index system of performance evaluation of engineering projects. In 2009 16th International Conference on Industrial Engineering and Engineering Management, pp. 1145-1149. IEEE. https://doi.org/10.1109/ICIEEM.2009.5344456

Gupta, B. and Seth, A. 2010. CRISP framework for post-project evaluation.

Hanisch, B. and Wald, A. 2014. Effects of complexity on the success of temporary organizations: relationship quality and transparency as substitutes for formal coordination mechanisms. Scandinavian Journal of Management, 30(2), pp. 197-213. https://doi.org/10.1016/j.scaman.2013.08.005

He, J. and Lei, N. 2020. Theory and method of project post-evaluation. Journal of Physics: Conference Series, 1549(3), P. 032099. https://doi.org/10.1088/1742-6596/1549/3/032099

Highway, A. 2015. Post opening project evaluation of major schemes: Meta-analysis 2015 - Main Report. London.

Högselius, P., Kaijser, A. and Van der Vleuten, E. 2016. Europe's infrastructure transition: Economy, war, nature: Springer.

Ismael, M.Q. and Mohammed, A.J. 2016. Improvement of traffic movement for roads network in Al-Kadhimiya city center. Journal of Engineering, 22(9), pp. 182-205. https://doi.org/10.31026/j.eng.2016.09.12.

Jha, K.N. 2013. Determinants of construction project success in india. dordrecht: Springer Netherlands.

Kelly, C. et al. 2015. Ex post appraisal: What lessons can be learnt from EU cohesion funded transport projects? Transport Policy, 37, pp. 83-91. https://doi.org/10.1016/j.tranpol.2014.09.011

Kisavi, J.M. 2019. Critical factors and their influence on performance of road construction projects in Kiambu County, Kenya.

Ledbetter, W.B. 1994. Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(34) .

Lientz, B. and Rea, K. 2007. Project management for the 21st century: Routledge.

Lim, C.S. and Mohamed, M.Z. 1999. Criteria of project success: an exploratory re-examination. International Journal Of Project Management, 17(4), pp. 243-248. https://doi.org/10.1016/S0263-7863(98)00040-4

Mahdi, H.J., Al-Bakri, M. and Ubaidy, A.L. 2023. Evaluating roads network connectivity for two municipalities in Baghdad-Iraq. Journal of Engineering, 29(6), pp. 60-71. https://doi.org/10.31026/j.eng.2023.06.05.

Maulud, D. and Abdulazeez, A.M. 2020. A review on linear regression comprehensive in machine learning. Journal of Applied Science and Technology Trends, 1(4), pp. 140-147. https://doi.org/10.38094/jastt1457

Meng, X. 2012. The effect of relationship management on project performance in construction. International Journal of Project Management, 30(2), pp. 188-198. https://doi.org/10.1016/j.ijproman.2011.04.002

Meunier, D. and Welde, M. 2017. Ex-post evaluations in Norway and France. Transportation Research Procedia, 26, pp. 144-155. https://doi.org/10.1016/j.trpro.2017.07.015

Müller, R., Geraldi, J. and Turner, J.R. 2011. Relationships between leadership and success in different types of project complexities. IEEE Transactions on Engineering Management, 59(1), pp. 77-90. https://doi.org/ 10.1109/TEM.2011.2114350

Müller, R. and Turner, R. 2007. The influence of project managers on project success criteria and project success by type of project. European Management Journal, 25(4), pp. 298-309. https://doi.org/10.1016/j.emj.2007.06.003

Murphy, R.E. 1997. The role of the project support office, PM Network, 11 (5), 33. May.

New Zealand Transport Agency, 2014. Post implementation review, lake road widening. Auckland Transport: New Zealand Transport Agency.

OECD, 2022. Glossary of key terms in evaluation and results-based management - 2nd edition.

Rahman, R.A., Radzi, A.R., Saad, M.S.H. and Doh, S.I. 2020. Factors affecting the success of highway construction projects: the case of Malaysia. IOP Conference Series: Materials Science and Engineering. 712 (1). https://doi.org/ 10.1088/1757-899X/712/1/012030.

Seninde, S., Muhwezi, L. and Acai, J. 2021. Assessment, performance, road construction projects, relative importance index. International Journal of Construction Engineering and Management. https://doi.org/ 10.5923/j.ijcem.20211004.02

Senthil S., and Jaheer Hussain M., 2010. Multi criteria decision making methodology for material selection using IPV. International Journal of the Applied Engineering of the Research 5, (23-24), 3627-3632.

Sarsam, S.I. and Abdulhameed, A.T., 2023. Development of pavement maintenance management system for baghdad urban roadway network. Journal of Engineering, 20(3), pp. 1-14. https://doi.org/10.31026/j.eng.2014.03.01

Scriven, M., 1991. Evaluation thesaurus. SAGE. Fourth Edition, International Educational and Profficinal Publisher Newbury Park London, New Delhi.

Transport Scotland., 2016. Scottish Trunk Road Infrastructure Project Evaluation-Final Guidance.

Welde, M. and Volden, G.H. 2018. Measuring efficiency and effectiveness through ex-post evaluation: case studies of Norwegian transport projects. https://doi.org/10.1016/j.rtbm.2018.05.001

Wibowo, A. and Alfen, H.W. 2015. Government-led critical success factors in PPP infrastructure development. Built Environment Project and Asset Management, 5(1), pp. 121-134. https://doi.org/10.1108/BEPAM-03-2014-0016

Winston, C. and Trevor, G., 2018. Transportation capital and its effects on the US economy: a general equilibrium approach. https://doi.org/10.1016/j.jmacro.2021.103334

Similar Articles

You may also start an advanced similarity search for this article.