Evaluation of the Project Overhead Costs in Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP)

Main Article Content

Sawsan M. Rashed
Salman A. M. Al-Dhaheri

Abstract

This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhead costs. So the contractors should deal with the project overhead costs carefully during estimate the bid.     


 

Article Details

How to Cite
“Evaluation of the Project Overhead Costs in Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP)” (2018) Journal of Engineering, 24(11), pp. 68–83. doi:10.31026/j.eng.2018.11.06.
Section
Articles

How to Cite

“Evaluation of the Project Overhead Costs in Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP)” (2018) Journal of Engineering, 24(11), pp. 68–83. doi:10.31026/j.eng.2018.11.06.

Publication Dates

Similar Articles

You may also start an advanced similarity search for this article.