The Cost of Technology Transfer in Construction Companies (In Iraq)
محتوى المقالة الرئيسي
الملخص
The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during technology transfer may lead to infractions in the company's budget. This manuscript aims to investigate the direct and indirect costs of transferring technology and the major factors constrained by this process. This work adopted a theoretical study and investigated the opinions of experts and engineers (by questionnaire) working in different construction sites. This Manuscript showed that the largest weight of the cost for both modern equipment and counsulant/designers is a direct cost and indirect cost, respectively, for transferring technology in the construction sector.
تفاصيل المقالة
كيفية الاقتباس
تواريخ المنشور
المراجع
Al-Ageeli, H.K., and Al-Zobaee, A.S.J., 2016. The most influential factor on the stumble and failure of the governmental projects. Journal of Engineering, 22 (2), pp. 93-110. Doi:10.31026/j.eng.2016.02.07
Al-Dairi, A.A., 2011. The impact of poor planning on the delay in the implementation of construction projects (Study of project management and construction companies sample opinions). Doctorate thesis, pp. 84-85.
Altaie, M.R., and Zuhair, M.S., 2009. Cost management and planning in construction projects. Journal of Engineering, 15(4), pp. 785-799.
Azeez, M.N., AlSaffar, A., 2014. Construction time – cost optimization modeling using ant colony optimization. Journal of Engineering, 20(1), pp. 114-131. Doi:10.31026/j.eng.2014.01.09
Bakar, A.H.A., 2004. Factors affecting technology transfer to indigenous construction companies in developing countries-a Malaysian experience. Ph.D theses, Bartlett School of Architecture and Planning, University College London (United Kingdom).
Boussabaine, A., 2013. Cost planning of PFI and PPP building projects. Routledge, Taylor and Francis Group.
Chou, J.S., 2011. Cost simulation in an item-based project involving construction engineering and management. International Journal of Project Management, 29(6), pp. 706-717. Doi:10.1016/j.ijproman.2010.07.010
Eden, L., Levitas, E., and Martinez, R.J., 1997. The production, transfer and spillover of technology: comparing large and small multinationals as technology producers. Small Business Economics, 9, pp. 53-66. Doi:10.1023/A:1007955832161
Eshofonie, F.P., 2008. Factors affecting cost of construction in Nigeria. M.Sc. thesis, University of Lagos, Akoka.
Flanagan, R., and Marsh, L., 2000. Measuring the costs and benefits of information technology in construction. Engineering, Construction and Architectural Management, 7(4), pp. 423-435. Doi:10.1108/eb021164
FME, T. 2014. Project cost management. Project Skills, www.free-management-ebooks.com: 43.
Ganiyu, B., and I. Zubairu 2010. Project cost prediction model using principal component regression for public building projects in Nigeria. Journal of Building Performance 1(1).
Husain, S.A., Alkindi, S.K., and Alwan, K.H., 2018. Efficient cost management in the housing project. Journal of Engineering, 24(1), pp. 1-21. Doi:10.31026/j.eng.2018.01.17
Kazaz, A., Ulubeyli, S., Er, B., and Acikara, T., 2016. Construction materials-based methodology for time-cost-quality trade-off problems. Procedia engineering, 164, pp. 35-41. Doi:10.1016/j.proeng.2016.11.589
Khabiri, N., S. Rast and A. A. Senin 2012. Identifying main influential elements in technology transfer process: A conceptual model. Procedia-Social and Behavioral Sciences, (40), pp. 417-423. Doi:10.1016/j.sbspro.2012.03.209
Lopes, J. 2012. Construction in the economy and its role in socio-economic development. New perspectives on construction in developing countries. Taylor and Francis Group Routledge. pp. 40-71.
Love, P.E., and Irani, Z., 2001. Evaluation of IT costs in construction. Automation in Construction 10(6): pp. 649-658. Doi:10.1016/S0926-5805(01)00058-9
Meeampol, S. and S. Ogunlan 2006. Factors affecting cost and time performance on highway construction projects: evidence from Thailand. Journal of Financial Management of property and Construction, 11(1), pp.3-20.
Meeampol, S., and Ogunlan, S., 2006. Factors affecting cost and time performance on highway construction projects: evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. Doi:10.1108/13664380680001076
Memon, A. H., I. A. Rahman, A. A. Aziz, K. V. Ravish and N. M. Hanas 2011. Identifying construction resource factors affecting construction cost: Case of Johor. Malaysian
Memon, A.H., 2011. Identifying construction resource factors affecting construction cost: Case of Johor. Malaysian Technical Universities International Conference on Engineering & Technology (MUiCET 2011).
Mselle, J. 2014. An evaluation of enabling factors for technology transfer in Tanzania construction industry. International Journal of Construction Engineering and Management 3(3).pp.99-104.
Mselle, J. 2014. An evaluation of enabling factors for technology transfer in Tanzania construction industry. International Journal of Construction Engineering and Management, 3(3), pp. 99-104.
Nyström, J., 2019. Updating and cleaning out: the make or buy decision in construction revisited. 10th Nordic Conference on Construction Economics and Organization, Emerald Publishing Limited.
Oti-Sarpong, K., and R., Leiringer 2021. International technology transfer through projects: A social construction of technology perspective. International Journal of Project Management, 39(8), pp. 902-914. Doi:10.1016/j.ijproman.2021.08.004
Potts, K., and N. Ankrah 2014. Construction cost management: learning from case studies. Routledge, Taylor and Francis Group.
Radujković, M., and Sjekavica, M., 2017. Project management success factors. Procedia engineering ,196: 607-615. Doi:10.1016/j.proeng.2017.08.048
Rezouki, S.E., and Muhsen, I.F., 2015. The Role of Transition of Workforce between Companies in Transferring Technology. Journal of Engineering, 21(12), pp. 63-82. Doi:10.31026/j.eng.2015.12.05
Skitmore, R.M., and Ng, S.T., 2003. Forecast models for actual construction time and cost. Building and Environment, 38(8), pp. 1075-1083. Doi:10.1016/S0360-1323(03)00067-2
Strom, K., 2017. Research on the impact of technology on policing strategy in the 21st century. Final report. Washington, DC: US Department of Justice.
Sunke, D.K.N., 2008. Planning of construction projects: a managerial approach. Ph.D theses, Department of Civil Engineering, the University of Siegen.
Technical Universities International Conference on Engineering & Technology MUiCET 2011.
Timothy D. Blackburn, M., PE., 2020. Cost estimating and tricks of the trade - a practical approach. www.PDHonline.com
Turner, J.R., 2009. Handbook of project-based management: Leading strategic change in organizations. McGraw-Hill Education.
UNFCCC, 2006. A guidebook on preparing technology transfer projects for financing. Climate Change Secretariat (UNFCCC) Bonn, Germany, Philip LaRocco, Maria Salinas: 127.
Warsame, A., 2006. Supplier structure and housing construction costs. The Annual Report of Royal Institute of Technology, Stockholm. Report 5: 73.
Wells, J., 1984. The construction industry in the context of development: a new. Habitat International, 8(3–4), pp.9-28. Doi:10.1016/0197-3975(84)90040