DEFLECTION OF STRAIGHT AND CAMBERED BEAMS MEASURED DURING FOURTEEN HOURS PER DAY
محتوى المقالة الرئيسي
الملخص
Straight and camber beams in portal frames [Footings + Columns + Beams] were studied. Deflection for period of fourteen hours in a day was measured for ten days. Peak value of deflection within a day is predicted for each one of the beams under a sustained load uniformly distributed. It is suggested that the load test is to be performed during critical period, within a day, that gives peak deflection.
تفاصيل المقالة
القسم
كيفية الاقتباس
المراجع
“Building Code Requirements For Structural Concrete”, ACI 318M-2002, and Commentary –ACI 318MR-2002, American Institute, Detroit, Michigan.
CEB-FIB Model Code for Concrete Structures, 3rd Edition, 1978.
“Iraqi Building Code Requirements for Reinforced Concrete”, Code 1/ 1987, Building Research Center, Scientific Research Council.
Salvadori and Heller, “Structure in Architecture ”, Prentice - Hall, Inc., Englewood Cliffs, NewJersey.
Shasha, Kais A. O., “ Control of Camber of Concrete Beams to Minimize Steel Reinforcement ”, M. Sc. Thesis, University of Baghdad, 1990.