An Extensive Literature Review on Risk Assessment Models (Techniques and Methodology) for Construction Industry
Main Article Content
Abstract
This study looks into the many methods that are used in the risk assessment procedure that is used in the construction industry nowadays. As a result of the slow adoption of novel assessment methods, professionals frequently resort to strategies that have previously been validated as being successful. When it comes to risk assessment, having a precise analytical tool that uses the cost of risk as a measurement and draws on the knowledge of professionals could potentially assist bridge the gap between theory and practice. This step will examine relevant literature, sort articles according to their published year, and identify domains and qualities. Consequently, the most significant findings have been presented in a manner that is consistent with logic and is predicated on the temporal evolution between 1990 and 2015.
Article received: 28/09/2022
Article accepted: 28/11/2022
Article published: 01/08/2023
Article Details
How to Cite
Publication Dates
References
Ackermann, F., Eden, C., Williams, T., and Howick, S., 2007. Systemic risk assessment: a case study. Journal of the Operational Research Society, 58, pp. 39–51. Doi:10.1080/09544828.2012.720014
Al Bahar, J.F., and Crandall, K.C., 1990. Systematic risk management approach for construction projects. Journal of Construction Engineering and Management, pp. 116-533. Doi:10.1061/07339364.1990.116:3(533).
Al-Geelawee, E.K., and Mohammed, A.N., 2016. Application of total quality management (TQM) requirements in risk management in construction projects in Iraq. Journal of Engineering, 22 (6). Doi:10.31026/j.eng.2016.06.12
Aven, T., Vinnem, J., and Wiencke, H., 2007. A decision framework for risk management, with application to the offshore oil and gas industry. Reliability Engineering and System Safety, 92, pp. 433–448. Doi:10.1016/j.ress.2005.12.009.
Baccarini, D., and Archer, R., 2001. The risk ranking of projects: a methodology. International Journal of Project Management 19, pp. 139–145. Doi:10.1016/S0263-7863(99)00074-5.
Baker, S., Ponniah, D., and Smith, S., 1998. Techniques for the analysis of risks in major projects. Journal of the Operational Research Society, 49, pp. 567–572. Doi:10.2307/3010665.
Baloi, D., and Price, A.D.F., 2003. Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21, pp. 261–269. Doi:10.1016/S0263-7863(02)00017-0
Barnes, M., 1983. How to allocate risks in construction contracts? International Journal of Project Management 1, pp. 24–28. Doi:10.1016/0263-7863(83)90034-0.
Ben-David, I., and Raz, T., 2001. An integrated approach for risk response development in project planning. Journal of the Operational Research Society, pp. 14–25. Doi:10.1057/palgrave.jors.2601029.
BSI-6079-4, 2006. Project management — Part 4: guide to project management in the construction industry. London: Institute, B.S.
Cagno, E., Caron, F., and Mancini, M., 2007. A multi-dimensional analysis of major risks in complex projects. Risk Management, 9, pp.1–18. Doi: 10.1057/palgrave.rm.8250014.
Cervone, H.F., 2006. Project risk management. OCLC Systems and Services, 22, pp. 256–262. Doi:10.1016/S0263-7863(97)82886-4.
Chan, E.H.W., and Au, M.C.Y., 2008. Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134, P.673. Doi:10.1061/(ASCE)0733-9364(2008)134:9(673)
Chapman, C., and Ward, S., 2000. Estimation and evaluation of uncertainty: a minimalist first pass approach. International Journal of Project Management, 18, pp. 369–383. Doi:10.1016/S0263-7863(00)00016-8
Choi, H.H., Cho, H.N., and Seo, J., 2004. Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130, 258. Doi:10.1061/(ASCE)0733-9364(2004)130:2(258).
Cioffi, D.F., and Khamooshi, H., 2009. A practical method of determining project risk contingency budgets. Journal of the Operational Research Society 60, 565–571. Doi:10.1057/palgrave.jors.2602586.
Dawood, N., 1998. Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16, pp. 41–48. Doi:10.1080/014461998372574
Dey, P., Tabucanon, M.T., and Ogunlana, S.O., 1994. Planning for project control through risk analysis: a petroleum pipeline-laying project. International Journal of Project Management 12, pp. 23–33. Doi:10.1108/00251740110399558.
Dey, P.K., 2001. Decision support system for risk management: a case study. Management Decision 39, pp. 634–649. Doi:10.1108/00251740110399558.
Diekmann, E., 1992. Risk analysis: lessons from artificial intelligence. International Journal of Project Management 10, pp. 75–80. Doi:10.1016/0263-7863(92)90059.
Dikmen, I., and Birgonul, M.T., 2006. An analytic hierarchy process based model for risk and opportunity assessment of international construction projects. Canadian Journal of Civil Engineering 33, pp. 58–68. Doi:10.1139/l05-087.
Dikmen, I., Birgonul, M.T., and Arikan, A.E., 2004. A critical review of risk management support tools. In: Khosrowshahi, F. (Ed.), 20th Annual ARCOM Conference. Heriot-Watt University, Edinburgh, UK, pp. 1145–1154. Doi:10.1108/00251740110399558.
Dikmen, I., Birgonul, M.T., and Gur, A.K., 2007a. A case-based decision support tool for bid mark-up estimation of international construction projects. Automation in Construction 17, pp. 30–44. Doi:10.1016/j.autcon.2007.02.009
Dikmen, I., Birgonul, M.T., and Han, S., 2007b. Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International Journal of Project Management 25, pp. 494–505. Doi: 10.1016/j.ijproman.2006.12.002.
Dikmen, I., Birgonul, M.T., and Ozorhon, B., 2007c. Project appraisal and selection using the analytic network process. Canadian Journal of Civil Engineering 34, pp. 786–792. Doi:10.1139/L07-006
Fang, C., and Marle, F., 2012. A simulation-based risk network model for decision support in project risk management. Decision Support Systems 52, pp. 635–644. Doi:10.1016/j.dss.2011.10.021.
Flanagan, R., and Norman, G., 1993. Risk management and construction. Wiley- Blackwell. Doi:10.4236/ojn.2023.135020.
Franke, A., 1987. Risk analysis in project management. International Journal of Project Management, 5, pp. 29–34. Doi: 10.4236/ojn.2023.135020.
Fung, I.W.H., Tam, V.W.Y., Lo, T.Y., and Lu, L.L.H., 2010. Developing a risk assessment model for construction safety. International Journal of Project Management, 28, pp. 593–600. Doi:10.4236/ojn.2023.135020
Han, S.H., Kim, D.Y., Kim, H., and Jang, W.S., 2008. A web-based integrated system for international project risk management. Automation in Construction, 17, pp. 342–356. Doi:10.4236/ojn.2023.135020
Hashemi, H., Mousavi, S.M., and Mojtahedi, S.M.H., 2011. Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137, pp. 600–608. Doi:10.1061/(ASCE)CO.1943-7862.0000344
Hastak, M., and Shaked, A., 2000. ICRAM-1: model for international construction risk assessment. Journal of Management in Engineering 16, pp. 59–69. Doi: 10.4236/ojn.2023.135020
Hsueh, S.L., Perng, Y.H., Yan, M.R., and Lee, J.R., 2007. On-line multi-criterion risk assessment model for construction joint ventures in China. Automation in Construction 16, pp.607–619. Doi:10.4236/ojn.2023.135020.
Hull, J., 1990. Application of risk analysis techniques in proposal assessment. International Journal of Project Management 8, pp. 152–157. Doi: 10.4236/ojn.2023.135020.
Huseby, A., and Skogen, S., 1992. Dynamic risk analysis: The dynrisk concept. International Journal of Project Management 10, pp. 160–164. Doi: 10.4236/ojn.2023.135020
Jannadi, O.A., and Almishari, S., 2003. Risk assessment in construction. Journal of Construction Engineering and Management 129, 492. Doi:10.2307/3010665
Kangari, R., and Riggs, L.S., 1989. Construction risk assessment by linguistics. IEEE Transactions on Engineering Management, 36, pp.126–131. Doi: 10.4236/ojn.2023.135020
Larsson, T.J., and Field, B., 2002. The distribution of occupational injury risks in the Victorian construction industry. Safety Science 40, pp. 439–456. Doi:10.2307/3010665
Laryea, S., 2008. Risk pricing practices in finance, insurance, and construction, COBRA 2008. Doi:10.2307/3010665
Laryea, S., and Hughes, W., 2008. How contractors price risk in bids: theory and practice. Construction Management and Economics, 26, pp.911–924. Doi:10.1016/j. ijproman.2013.06.002
Latham, M., 1994. Constructing the team. London: HMSO. Doi:10.1080/09544828.2012.720014.
Lazzerini, B., and Mkrtchyan, L., 2011. Analyzing risk impact factors using extended fuzzy cognitive maps. IEEE Systems Journal 5, pp. 288–297. Doi:10.1080/01446190050024905.
Luu, V.T., Kim, S.Y., Tuan, N.V., and Ogunlana, S.O., 2009. Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management 27, 39–50. Doi: 10.4236/ojn.2023.135020
Marle, F., 2013. Dealing with project complexity by matrix-based propagation modelling for project risk analysis. Journal of Engineering Design, 24(4), pp.239–256. Doi:10.1080/09544828.2012.720014.
Marle, F., and Vidal, L.A., 2011. Project risk management processes: improving coordination using a clustering approach. Research in Engineering Design 22, 189–206. Doi:10.4236/ojn.2023.135020
Martin L, 1996. ITS risk analysis. Prepared for Federal Highway Administration US Department of Transportation, Washington, D.C., USA. Doi:10.1080/10962247.2015.1119217.
Mojtahedi, S.M.H., Mousavi, S.M., and Makui, A., 2010. Project risk identification and assessment simultaneously using multi-attribute group decision making technique. Safety Science, 48, pp. 499–507. Doi:10.2307/3010665.
Molenaar, K.R., 2005. Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131, 343. Doi: 10.4236/ojn.2023.135020.
Mulholland, B., and Christian, J., 1999. Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(8). Doi:10.1080/01446190050024905.
Mustafa, M.A., and Al-Bahar, J.F., 1991. Project risk assessment using the analytic hierarchy process. IEEE Transactions on Engineering Management, 38, pp.46–52. Doi:10.1080/01446190050024905.
Nasirzadeh, F., Khanzadi, M., and Rezaie, M. 2014. Dynamic modeling of the quantitative risk allocation in construction projects. International Journal of Project Management, 32(3), pp. 442–451. Doi:10.1016/j. ijproman.2013.06.002.
Nieto-Morote, A., and Ruz-Vila, F., 2011. A fuzzy approach to construction project risk assessment. International Journal of Project Management 29, pp. 220–231. Doi: 10.4236/ojn.2023.135020.
Paek, J., Lee, Y., and Ock, J., 1993. Pricing construction risks: fuzzy set theory. Journal of Construction Engineering and Management 119, pp. 743–756. Doi:10.1016/j. ijproman.2013.06.002
Poh, Y., and Tah, J., 2006. Integrated duration–cost influence network for modelling risk impacts on construction tasks. Construction Management & Economics 24, pp.861–868. Doi:10.1080/09544828.2012.720014.
Rasheed, E.K., 2015a. Development of a Blueprint Impact System of the risks on construction projects Implementation. Journal of Engineering, 21(8), pp.28-49. Doi:10.31026/j.eng.2015.08.12
Rasheed, E.K., 2015b. Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq. Journal of Engineering, 21(4), pp.1-19. Doi:10.31026/j.eng.2015.04.10
Riggs, J.L., Brown, S.B., and Trueblood, R.P., 1994. Integration of technical, cost, and schedule risks in project management. Computers and Operations Research, 21, pp. 521–533. Doi:10.1080/09544828.2012.720014
Shang, H., Anumba, C.J., Bouchlaghem, D.M., Miles, J.C., Cen, M., and Taylor, M., 2005. An intelligent risk assessment system for distributed construction teams. Engineering Construction and Architectural Management, 12, pp. 391–409. Doi:10.1080/01446190050024905.
Simister, S.J., 1994. Usage and benefits of project risk analysis and management. International Journal of Project Management, 12, pp. 5–8.
Tah, J., and Carr, V., 2000. A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18, pp. 491–500. Doi:10.1080/01446190050024905.
Tah, J., and Carr, V., 2001. Knowledge-based approach to construction project risk management. Journal of Computing in Civil Engineering, 15, 170. Doi:10.1080/09544828.2012.720014
Tah, J., Thorpe, A., and McCaffer, R., 1993. Contractor project risks contingency allocation using linguistic approximation. Computing Systems in Engineering, 4, pp. 281–293. Doi:10.2307/3010665
Thomas, A., Kalidindi, S., and Ganesh, L., 2006. Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24, pp. 407–424. Doi:10.1080/09544828.2012.720014.
Vidal, L.A., and Marle, F., 2012. A system thinking approach for project vulnerability management. Kybernetes, 41, pp. 206–228.
Ward, S., and Chapman, C., 2003. Transforming project risk management into project uncertainty management. International Journal of Project Management 21, pp. 97–105. Doi.org/10.2307/3010665
Ward, S.C., 1999. Assessing and managing important risks. International Journal of Project Management 17, pp.331–336.
Williams, T., 1993. Risk-management infrastructures. International Journal of Project Management 11, pp. 5–10. Doi:10.1080/09544828.2012.720014.
Williams, T., 1995. A classified bibliography of recent research relating to project risk management. European Journal of Operational Research 85, pp. 18–38. Doi:10.1080/09544828.2012.720014.
Williams, T., 1996. The two-dimensionality of project risk. International Journal of Project Management 14, pp. 185–186. Doi:10.1016/0263-7863(96)00030-0
Winch, G.M., 2003. Managing construction projects. Oxford: Wiley-Blackwell. Doi:10.1080/01446193.2015.1021703
Wirba, E., Tah, J., and Howes, R., 1996. Risk interdependencies and natural language computations. Engineering Construction and Architectural Management, 3, pp. 251–269. Doi:10.2307/3010665
Wood, G.D., and Ellis, R.C.T., 2003. Risk management practices of leading UK cost consultants. Engineering Construction and Architectural Management 10, pp. 254–262. Doi:10.1108/09699980310489960
Xu, T., and Tiong, R.L.K., 2001. Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19, pp. 77–84. Doi:10.1080/01446190010002561
Yeo, K., 1990. Risks, classification of estimates, and contingency management. Journal of Management in Engineering, 6, 458. Doi:10.1061/(ASCE)9742-597X(1990)6:4(458).
Zayed, T., Amer, M., and Pan, J., 2008. Assessing risk and uncertainty inherent in Chinese highway projects using AHP. International Journal of Project Management 26, pp. 408–419. Doi:10.1016/j.ijproman.2007.05.012
Zeng, J., An, M., and Smith, N.J., 2007. Application of a fuzzy based decision-making methodology to construction project risk assessment. International Journal of Project Management, 25, pp. 589–600. Doi:10.1016/j.ijproman.2007.02.006
Zhang, G., and Zou, P.X.W., 2007. Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management, 133, 771. Doi:10.1061/(ASCE)0733-9364(2007)133:10(771)
Zhang, H., 2007. A redefinition of the project risk process: using vulnerability to open up the event-consequence link. International Journal of Project Management, 25, pp. 694–701. Doi:10.1016/j.ijproman.2007.02.004.
Zhi, H., 1995. Risk management for overseas construction projects. International Journal of Project Management, 13, pp. 231–237. Doi:10.1080/09544828.2012.720014.
Zou, P.X.W., Zhang, G., and Wang, J., 2007. Understanding the key risks in construction projects in China. International Journal of Project Management, 25, pp. 601–614. Doi:10.1016/j.ijproman.2007.03.001.