Main Delay Factors of Implementation EPC Construction Projects in Iraq
Main Article Content
Abstract
This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.
Article Details
Section
How to Cite
References
Abd El-Razek, M.E., Bassioni, H.A., and Mobarak, A. M., 2008. Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. Doi:10.1061/(ASCE)0733-9364(2008)134:11(831).
Ahuja, H.N., Dozzi, S.P. and Abourizk, S.M., 1994. Project management: techniques in planning and controlling construction projects. John Wiley and Sons.
Alajmi, A. M., and Ahmed Memon, Z., 2022. A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects. Smart Cities, 5(4), pp. 1465-1487. Doi:10.3390/smartcities5040075.
Alhajri, A. R., and Alshibani, A., 2018. Critical factors behind construction delay in petrochemical projects in Saudi Arabia. Energies, 11(7), P.1652. Doi:10.3390/en11071652.
Ali, N. S., 2021. Variation Orders and Their Effects on Erbil Governorate Projects. Journal of Engineering, 27(5), pp. 75-88. Doi:10.31026/j.eng.2021.05.06.
Back, W. E., and Moreau, K. A., 2000. Cost and schedule impacts of information management on EPC process. Journal of Management in Engineering, 16(2), pp. 59-70. Doi:10.1061/(ASCE)0742-597X(2000)16:2(59).
Cronbach, L. J., 1951. Coefficient alpha and the internal structure of tests. psychometrika, 16(3), pp. 297-334. Doi:10.1007/BF02310555.
Doloi, H., Sawhney, A., Iyer, K. C., and Rentala, S., 2012. Analyzing factors affecting delays in Indian construction projects. International journal of project management, 30(4), pp. 479-489. Doi:10.1016/j.ijproman.2011.10.004.
Durdyev, S., and Hosseini, M. R., 2020. Causes of delays on construction projects: a comprehensive list. International journal of managing projects in business, 13(1), pp. 20-46. Doi:10.1108/IJMPB-09-2018-0178.
Edition, P.S., 2018. A guide to the project management body of knowledge. Project Management Institute. Pennsylvania.
Enshassi, A., Al‐Najjar, J., and Kumaraswamy, M., 2009. Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. Doi:10.1108/13664380910977592.
Gebrehiwet, T., and Luo, H., 2017. Analysis of delay impact on construction project based on RII and correlation coefficient: Empirical study. Procedia engineering, 196, pp. 366-374. Doi:10.1016/j.proeng.2017.07.212.
Joshi, A., Kale, S., Chandel, S., and Pal, D. K., 2015. Likert scale: Explored and explained. British Journal of Applied Science and Technology, 7(4), P. 396. Doi:10.9734/BJAST/2015/14975.
Kumaraswamy, M.M., and Chan, D.W., 1998. Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. Doi:10.1080/014461998372556.
Lundkvist, R., Meiling, J. H., and Sandberg, M., 2014. A proactive plan-do-check-act approach to defect management based on a Swedish construction project. Construction Management and Economics, 32(11), pp. 1051-1065. Doi:10.1080/01446193.2014.966733.
Miller, D.C. and Salkind, N.J., 2002. Handbook of research design and social measurement. Sage.
Mpofu, B., Ochieng, E. G., Moobela, C., and Pretorius, A., 2017. Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction, and Architectural Management.
Muhwezi, L., Acai, J., and Otim, G., 2014. An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1), pp. 13-23. Doi:10.5923/j.ijcem.20140301.02.
Olawale, Y. A., and Sun, M., 2010. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. Doi:10.1080/01446191003674519.
Rashed, S. M., and Al-Dhaheri, S. A., 2018. Evaluation of the Project Overhead Costs in the Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP). Journal of Engineering, 24(11), pp. 68-83. Doi:10.31026/j.eng.2018.11.06.
Sambasivan, M., and Soon, Y. W., 2007. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), pp. 517-526. Doi:10.1016/j.ijproman.2006.11.007.
Sanni-Anibire, M. O., Mohamad Zin, R., and Olatunji, S. O., 2022. Causes of delay in the global construction industry: a meta-analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. Doi:10.1080/tandf_crossmark_01.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015. Construction project management. John Wiley and Sons.
Suppramaniam, S. U. K., Ismail, S., and Suppramaniam, S., 2018. Causes of delay in the construction phase of oil and gas projects in Malaysia. International Journal of Engineering and Technology, 7(2.29), pp. 203-209. Doi:10.14419/ijet.v7i2.29.13318.
Sustaita, M., 2016. Petronas delays PFLNG 2 amid slump. Offshore Engineer.
Yasamis, F., Arditi, D., and Mohammadi, J., 2002. Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. Doi:10.1080/01446190110113693.
Yeo, K. T., and Ning, J. H., 2002. Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects. International Journal of Project Management, 20(4), pp. 253-262. Doi:10.1016/S0263-7863(01)00021-7.