Improving Project Performance Based on Information and Communication Technology

Main Article Content

Maytham B. Abdulhussain
Abbas M. Burhan

Abstract

Ict contributes to the establishment of deeper approaches to how to sustain major projects. On this basis, this research presents the impact of ICT-specific factors on performance indicators of major projects by utilizing a combination of surveys, expert opinions, interviews, and exploratory research, with the help of previous studies in the field of construction projects. The primary investigation assessed the impact of implementing risk management techniques on performance indicators by utilizing a combination of surveys, expert opinions, interviews, and exploratory research, drawing upon previous studies in the field of construction projects. The initial findings were obtained by calculating the factors effect. The identification of the relative importance index (RII) effect facilitated the determination of the consequences. The results of the RII analysis indicate a high level of resistance to change and a moderate level of effectiveness in scheduling and information and communication technology based job planning, with scores of the long payback periods factor and group decision making being made easier, respectively.  Following the collection of data, the MCDM approach was employed to analyze it. It was discovered that two risk categories, inadequate rating systems and programs and financial management utilizing information and communication technology, more accurately represent the risk factors. The MCDM results yielded outcomes that were both more accurate and practical.

Article Details

Section

Articles

How to Cite

“Improving Project Performance Based on Information and Communication Technology” (2025) Journal of Engineering, 31(4), pp. 113–125. doi:10.31026/j.eng.2025.04.08.

References

Abbas, N.N. and Burhan, A.M., 2022. Investigating the causes of poor cost control in Iraqi construction projects. Engineering, Technology & Applied Science Research, 12(1), pp. 8075-8079. https://doi.org/10.48084/etasr.4661

Al-Aloosy, K.F.Q., Mirvalad, S. and Shabakhty, N., 2024. Evaluating the impact of internet communication quality in human resource management on the productivity of construction projects. Heliyon, 10(7). https://doi.org/10.1016/j.heliyon.2024.e28500

Alfahad, A.A. and Burhan, A.M., 2024. Evaluating the knowledge for integrating RM and VM using BIM in the Iraqi construction sector. Journal of Engineering, 30(02), pp. 154-178. https://doi.org/10.31026/j.eng.2024.02.11

Ali, Z.H., Burhan, A.M., Kassim, M. and Al-Khafaji, Z., 2022. Developing an integrative data intelligence model for construction cost estimation. Complexity, 2022. https://doi.org/10.1155/2022/4285328

Bari, N.A.A., Yusuff, R., Ismail, N., Jaapar, A. and Ahmad, R., 2012. Factors influencing the construction cost of industrialised building system (IBS) projects. Procedia-Social and Behavioral Sciences, 35, pp.689-696. https://doi.org/10.1016/j.sbspro.2012.02.138.

Bendi, D., 2017. Developing an offsite readiness framework for Indian construction organisations. University of Salford (United Kingdom). https://doi.org/10.1063/1.5042905.

Black, M., 2017. Crossrail project: Managing geotechnical risk on London’s elizabeth line. Proceedings of the Institution of Civil Engineers: Civil Engineering, 170(5), pp. 23–30. https://doi.org/10.1680/jcien.16.00024

Camngca, V.P., Amoah, C. and Ayesu-Koranteng, E., 2024. Underutilisation of information communication and technology in the public sector construction project’s implementation. Journal of Facilities Management, 22(1), pp. 1-20. https://doi.org/10.1108/JFM-10-2021-0128

Eliwa, H.K., Jelodar, M.B., Poshdar, M. and Zavvari, A., 2024. Organizational infrastructure and information and communication technology infrastructure alignment in construction organizations. Journal of Construction Engineering and Management, 150(7), p. 04024057. https://doi.org/10.1061/JCEMD4.COENG-13808

Fadhil, G.A. and Burhan, A.M., 2021. Investigating the effects of economic crisis on construction projects in Iraq. In E3S Web of Conferences (Vol. 318, p. 02005). EDP Sciences. https://doi.org/10.1051/e3sconf/202131802005.

Gransberg, D.D., Loulakis, M., Touran, A., Gad, G., McLain, K., Sweitzer, S., Pittenger, D., Nova, I.C., Pereira, R.T. and Pinto-Nunez, M., 2018. Managing geotechnical risks in design–build projects (No. Project 24-44), https://doi.org/10.17226/25261.

Jaafar, M., Salman, A., Ghazali, F.E.M., Zain, M.Z.M. and Kilau, N.M., 2024. The awareness and adoption level of emerging technologies in Fourth Industrial Revolution (4IR) by contractors in Malaysia. Ain Shams Engineering Journal, p.102710. https://doi.org/10.1016/j.asej.2024.102710

Jalhoom, R.J.K. and Mahjoob, A.M.R., 2023. An extensive literature review on risk assessment models (techniques and methodology) for construction industry. Journal of Engineering, 29(08), pp. 76-93. https://doi.org/10.31026/j.eng.2023.08.06

Khairullah, N. H., Hilal, M. A., and Burhan, A. M. 2023. Main delay factors of implementation EPC construction projects in Iraq. Journal of Engineering, 29(10), pp. 195-207. https://doi.org/10.31026/j.eng.2023.10.12

Koç, K., Gurgun, A.P. and Ozbek, M.E., 2020. Effects of geotechnical risks on cost and schedule in infrastructure projects. Proc. Int. Struct. Eng. Constr, 7(2). https://doi.org/10.14455/ISEC.2020.7(2).CON-18.

Lateef, H.H. and Burhan, A.M., 2019. Time-cost-quality trade-off model for optimal pile type selection using discrete particle swarm optimization algorithm. Civil Engineering Journal, 5(11), pp. 2461-2471. http://dx.doi.org/10.28991/cej-2019-03091424

Mahjoob, A.M.R., 2014. The Effect of Age and occupation on the type and the number of workers injuries in construction sector in Iraq. Journal of Engineering, 20(12), pp. 31-44. https://doi.org/10.31026/j.eng.2014.12.12

Mahmoudkelaye, S., Azari, K.T., Pourvaziri, M. and Asadian, E., 2018. Sustainable material selection for building enclosure through ANP method. Case Studies in Construction Materials, Buildings, 9, p.e00200. https://doi.org/10.1016/j.cscm.2018.e00200

Marwa, M., and Altaie, M.R., 2022. Use risk score method to identify the qualitative risk analysis criteria in tendering phase in construction projects. Journal of Engineering, 28(7), pp. 31-42. https://doi.org/10.31026/j.eng.2022.07.03

Mohammad, S.R. and Rasheed, A.M., 2014. Study on safety construction management plan. Journal of Engineering, 20(11), pp. 1-19. https://doi.org/10.31026/j.eng.2014.11.01

Mohammad, S.R., and Rasheed, A.M., 2014. Study on safety construction management plan. Journal of Engineering, 20(11), pp. 1-19. https://doi.org/10.31026/j.eng.2014.11.01

Mohammed, H. S., and Hilal, M. A. 2024. Improving building information modeling (BIM) implementation throughout the construction industry. Journal of Engineering, 30(02), 85-104. https://doi.org/10.31026/j.eng.2024.02.06

Paudyal, G. and Prakriti, K., 2016, August. Role of ICT in construction. In National Students Conference on Information Technology (NaSCoIT), Hotel Yak and Yeti, Kathmandu, Nepal (Vol. 16). https://doi.org/10.46717/igj.39-49.2.7Ms-2016-12-30.

Polyankin, A.G., Potokina, A. and Kulikova, E.Y., 2020. Geotechnical risk assessment during the construction of international crossing under the runways of Sheremetyevo airport. IOP Conference Series: Materials Science and Engineering, 962(3). https://doi.org/10.1088/1757-899X/962/3/032017

Rasheed, E.K., 2015. Valuation the impact of risks on the goals and the safety of construction projects in Iraq. Journal of Engineering, 21(4), pp. 1-19. https://doi.org/10.31026/j.eng.2015.04.10

Rashid, H.A., 2023. Empirical study for capturing and allocating significant risk factors in school construction projects in Iraq. Journal of Engineering, 29(12), pp. 81-103. https://doi.org/10.31026/j.eng.2023.12.06.

Rashid, H.A., 2023. Empirical Study for Capturing and allocating significant risk factors in school construction projects in Iraq. Journal of Engineering, 29(12), pp. 81-103. https://doi.org/10.31026/j.eng.2023.12.06

Saleh, F., Elhendawi, A., Darwish, A.S. and Farrell, P., 2024. An ICT-based framework for innovative integration between BIM and lean practices obtaining smart sustainable cities. Journal of Intelligent Systems and Internet of Things, 14(2), pp. 68-75. https://doi.org/10.54216/FPA.140205

Shadhar, A.K. and Mahmood, B.B., 2018. Risks of design stage in Iraqi construction project. Journal of Engineering, 24(3), pp. 114-121. https://doi.org/10.31026/j.eng.2018.03.09

Sinaga, A. and Maulana, D., 2022. Implementation of weighted product method for evaluating performance of technicians. International Journal of Modern Education and Computer Science, 14(4), pp. 30–42. https://doi.org/10.5815/ijmecs.2022.04.03.

Skulmoski, G.J., Hartman, F.T. and Krahn, J., 2007. The Delphi method for graduate research. Journal of Information Technology Education: Research, 6(1), pp. 1-21. https://doi.org/10.28945/199

Vishwakarma, A., Thakur, A., Singh, S. and Salunkhe, A., 2016. Risk assessment in construction of highway project. International Journal of Engineering Research & Technology, 5(2), pp. 637-640. https://doi.org/10.17577/ijertv5is020515.

Similar Articles

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)